Evidaxis

Xinference

repo
Inference & Serving · n = 13 · xorbitsai/inference
Single-axis · conf low
momentum
momentum 56.1 of 100 56.1 /100
momentum
56.1/100
pctile
p83
convergence gate
Convergence gate: velocity only, citation axis absent ×
gate
0 of 2 axes

velocity only, citation axis absent.

gate shut
position in cohort distribution one of 13 in cohort
percentile 83 within cohort p25 p50 p75 p0 p100
percentile
p83
momentum is the combined velocity and citation signal, percentile within cohort
velocity z
velocity z gaugevelocity z+0.49 within cohort, log-slope +0.042/wk.0+0.49
velocity z
+0.49 σ
slope
+0.042/wk
log-slope +0.042/wk
convergence planefull gate = rising
Xinference on the convergence plane Xinference at velocity z +0.49 and citation z no axis, against 0 dual-axis cohort peers. single-axis: citation axis absent, excluded from the plane. z>=1 median velocity z → citation z ↑
velocity z
+0.49
citation z
no axis
peers
12

single-axis: citation axis absent, excluded from the plane.

citation z no citation axis
cohort
13
systems measured
weekly commits
21.8
not rising
total citations
n/a
no axis
momentum
56.1
percentile p83
commit heatmap, last 26 weeks21.8/wk
weekly commits, 26 weeks26 weeks of commits, peak 37 in a week, 26 active weeks, 444 total.week 1: 12 commitsweek 2: 3 commitsweek 3: 8 commitsweek 4: 10 commitsweek 5: 12 commitsweek 6: 15 commitsweek 7: 12 commitsweek 8: 17 commitsweek 9: 13 commitsweek 10: 17 commitsweek 11: 25 commitsweek 12: 10 commitsweek 13: 14 commitsweek 14: 14 commitsweek 15: 12 commitsweek 16: 19 commitsweek 17: 18 commitsweek 18: 22 commitsweek 19: 22 commitsweek 20: 16 commitsweek 21: 37 commitsweek 22: 17 commitsweek 23: 28 commitsweek 24: 31 commitsweek 25: 25 commitsweek 26: 15 commits
weeks
26
peak/wk
37
active
26
total
444
citations by yearno axis

Xinference holds an Evidaxis momentum score of 56.1 of 100 on methodology m2, snapshot 2026-08-08, measured within the Inference & Serving cohort (n = 13). No axis is currently rising within the cohort, and no second (citation) axis is available, so it sits below the two-axis gate.

Derived signals

second-order reads, computed from the published series

Three signals ship when the commit series is statistically sufficient; the rest are held in a reserved state until the data supports them. A reserved signal shows its reason, never a fabricated number. How these are computed.

recency-weighted swing trailing 13-week vs prior 39-week log-slope ratio +2.48, regime accelerating. prior slope +0.016, recent slope +0.039 per week. +0.016prior 39w+0.039recent 13w+2.48×
swing
+2.48×
regime
accelerating
windows
13w vs 39w
snapshot 1 of 1 · · m2
commit-axis Sharpe log-linear slope over residual std, value +0.043 with 95% CI +0.025 to +0.061, 50 degrees of freedom. CI excludes zero.0+0.04395% CI +0.025, +0.061+0.025+0.061
sharpe
+0.043
95% ci
+0.025, +0.061
dof
50
snapshot 1 of 1 · · m2
commit changepoint52 weekly commit points. Changepoint at week 50 (2026-07-25), slope change -8.269 commits per week.2026-07-25
date
week
50 of 52
Δslope
-8.269/wk
snapshot 1 of 1 · · m2
code-leads-citation lag reserved

reserved: citation series too short / axis absent for cross-correlation

status
reserved
value
insufficient data
snapshot 1 of 1 · · m2
axis alpha vs cohort reserved

reserved: cohort N too small for regression (power ~0)

status
reserved
value
insufficient data
snapshot 1 of 1 · · m2
gate ETA reserved

reserved: needs snapshot history (1 snapshot exists)

status
reserved
value
insufficient history
snapshot 1 of 1 · · m2
methodology gate snapshot 1 of 1 · · m2
commit weeks
52
citation years
0
shipped
3
reserved
3

shipped

  • recency-swing
  • commit-sharpe
  • commit-changepoint

reserved

  • code-leads-citation-lag
  • axis-alpha
  • gate-eta
snapshot 1 of 1 · · m2

Verdict

Xinference is tracked. No axis is currently rising relative to its cohort, and it has no second (citation) axis available.

Path to Rising: needs development velocity to turn positive within its cohort; a second measurable axis to exist (no academic paper is currently tracked).

Sources

xorbitsai/inference development-velocity axis
OpenAlex paper citation-momentum axis

Embed this badge

Evidaxis single-axis, Xinference
[![Evidaxis: Xinference](https://evidaxis.org/badge/e_8A2A58V55P6/2026-w32.svg)](https://evidaxis.org/e/e_8A2A58V55P6)
entity_id e_8A2A58V55P6 methodology m2 snapshot 035a72a81e59 period 2026-w32 record JSON ↓ source snapshot

Score derived from public data on Evidaxis methodology m2, never edited by hand. Cite as: “Evidaxis, Xinference, entity e_8A2A58V55P6, snapshot 2026-w32.”

Durable reference (format-independent): urn:evidaxis:claim:e_8A2A58V55P6:m2:2026-08-08