position in cohort distributionone of 16 in cohort
percentile
p93
momentum is the combined velocity and citation signal, percentile within cohort
velocity z
velocity z
+1.66 σ
slope
+0.030/wk
log-slope +0.030/wk
convergence planefull gate = rising
velocity z
+1.66
citation z
no axis
peers
15
single-axis: citation axis absent, excluded from the plane.
citation z
∅no citation axis
no citation axis
cohort
16
systems measured
weekly commits
45.8
rising trend
total citations
n/a
no axis
momentum
70.8
percentile p93
commit heatmap, last 26 weeks45.8/wk
weeks
26
peak/wk
94
active
26
total
933
citations by yearno axis
∅no citation axisaxis status: absent
dora-rs holds an Evidaxis momentum score of 70.8 of 100 on methodology m2, snapshot 2026-08-08, measured within the Robotics & Embodied AI cohort (n = 16). Its development-velocity axis is rising within the cohort while a second independent axis has not converged, so it sits below the two-axis gate.
Derived signals
second-order reads, computed from the published series
Three signals ship when the commit series is statistically sufficient; the rest are held in a reserved state
until the data supports them. A reserved signal shows its reason, never a fabricated number.
How these are computed.
swing
+2.45×
regime
accelerating
windows
13w vs 39w
snapshot 1 of 1 ·· m2
sharpe
+0.039
95% ci
+0.019, +0.060
dof
50
snapshot 1 of 1 ·· m2
date
week
50 of 52
Δslope
-25.584/wk
snapshot 1 of 1 ·· m2
code-leads-citation lagreserved
reserved: citation series too short / axis absent for cross-correlation
status
reserved
value
insufficient data
snapshot 1 of 1 ·· m2
axis alpha vs cohortreserved
reserved: cohort N too small for regression (power ~0)
status
reserved
value
insufficient data
snapshot 1 of 1 ·· m2
gate ETAreserved
reserved: needs snapshot history (1 snapshot exists)
status
reserved
value
insufficient history
snapshot 1 of 1 ·· m2
methodology gate
snapshot 1 of 1 ·· m2
commit weeks
52
citation years
0
shipped
3
reserved
3
shipped
recency-swing
commit-sharpe
commit-changepoint
reserved
code-leads-citation-lag
axis-alpha
gate-eta
snapshot 1 of 1 ·· m2
Verdict
dora-rs is rising on development velocity, but a second independent axis has not yet converged. It is on watch.
Path to Rising: needs a second measurable axis to exist (no academic paper is currently tracked).
Score derived from public data on Evidaxis methodology m2, never edited by hand. Cite as:
“Evidaxis, dora-rs, entity e_Y31RBTP1VWD, snapshot 2026-w32.”