position in cohort distributionone of 14 in cohort
percentile
p100
momentum is the combined velocity and citation signal, percentile within cohort
velocity z
velocity z
+3.01 σ
slope
+0.047/wk
log-slope +0.047/wk
convergence planefull gate = rising
velocity z
+3.01
citation z
no axis
peers
13
single-axis: citation axis absent, excluded from the plane.
citation z
∅no citation axis
no citation axis
cohort
14
systems measured
weekly commits
31.4
rising trend
total citations
n/a
no axis
momentum
87.7
percentile p100
commit heatmap, last 26 weeks31.4/wk
weeks
26
peak/wk
47
active
26
total
574
citations by yearno axis
∅no citation axisaxis status: absent
NeMo-RL holds an Evidaxis momentum score of 87.7 of 100 on methodology m2, snapshot 2026-08-08, measured within the Post-training & Alignment cohort (n = 14). Its development-velocity axis is rising within the cohort while a second independent axis has not converged, so it sits below the two-axis gate.
Derived signals
second-order reads, computed from the published series
Three signals ship when the commit series is statistically sufficient; the rest are held in a reserved state
until the data supports them. A reserved signal shows its reason, never a fabricated number.
How these are computed.
swing
-11.66×
regime
reversing
windows
13w vs 39w
snapshot 1 of 1 ·· m2
sharpe
+0.033
95% ci
+0.005, +0.060
dof
50
snapshot 1 of 1 ·· m2
date
week
4 of 52
Δslope
-6.610/wk
snapshot 1 of 1 ·· m2
code-leads-citation lagreserved
reserved: citation series too short / axis absent for cross-correlation
status
reserved
value
insufficient data
snapshot 1 of 1 ·· m2
axis alpha vs cohortreserved
reserved: cohort N too small for regression (power ~0)
status
reserved
value
insufficient data
snapshot 1 of 1 ·· m2
gate ETAreserved
reserved: needs snapshot history (1 snapshot exists)
status
reserved
value
insufficient history
snapshot 1 of 1 ·· m2
methodology gate
snapshot 1 of 1 ·· m2
commit weeks
52
citation years
0
shipped
3
reserved
3
shipped
recency-swing
commit-sharpe
commit-changepoint
reserved
code-leads-citation-lag
axis-alpha
gate-eta
snapshot 1 of 1 ·· m2
Verdict
NeMo-RL is rising on development velocity, but a second independent axis has not yet converged. It is on watch.
Path to Rising: needs a second measurable axis to exist (no academic paper is currently tracked).
Score derived from public data on Evidaxis methodology m2, never edited by hand. Cite as:
“Evidaxis, NeMo-RL, entity e_QHYA574DXDQ, snapshot 2026-w32.”