position in cohort distributionone of 14 in cohort
percentile
p62
momentum is the combined velocity and citation signal, percentile within cohort
velocity z
velocity z
-0.06 σ
slope
+0.000/wk
log-slope +0.000/wk
convergence planefull gate = rising
velocity z
-0.06
citation z
no axis
peers
13
single-axis: citation axis absent, excluded from the plane.
citation z
∅no citation axis
no citation axis
cohort
14
systems measured
weekly commits
0
not rising
total citations
n/a
no axis
momentum
49.3
percentile p62
commit heatmap, last 26 weeks0/wk
weeks
26
peak/wk
0
active
0
total
0
citations by yearno axis
∅no citation axisaxis status: absent
adoption55 dependents52 direct, 3 indirect · pypi/kokoro · deps.dev · adoption signal, not part of the momentum score
Kokoro-82M holds an Evidaxis momentum score of 49.3 of 100 on methodology m2, snapshot 2026-08-08, measured within the Media Generation cohort (n = 14). No axis is currently rising within the cohort, and no second (citation) axis is available, so it sits below the two-axis gate.
Derived signals
second-order reads, computed from the published series
Three signals ship when the commit series is statistically sufficient; the rest are held in a reserved state
until the data supports them. A reserved signal shows its reason, never a fabricated number.
How these are computed.
swing
+0.00×
regime
flat
windows
13w vs 39w
snapshot 1 of 1 ·· m2
commit Sharpereserved: <26 non-zero commit weeks
changepoint
none detected
snapshot 1 of 1 ·· m2
code-leads-citation lagreserved
reserved: citation series too short / axis absent for cross-correlation
status
reserved
value
insufficient data
snapshot 1 of 1 ·· m2
axis alpha vs cohortreserved
reserved: cohort N too small for regression (power ~0)
status
reserved
value
insufficient data
snapshot 1 of 1 ·· m2
gate ETAreserved
reserved: needs snapshot history (1 snapshot exists)
status
reserved
value
insufficient history
snapshot 1 of 1 ·· m2
methodology gate
snapshot 1 of 1 ·· m2
commit weeks
52
citation years
0
shipped
2
reserved
4
shipped
recency-swing
commit-changepoint
reserved
commit-sharpe
code-leads-citation-lag
axis-alpha
gate-eta
snapshot 1 of 1 ·· m2
Adoption trend
min
52 dependents
max
55 dependents
latest
55 dependents
points
6
Downstream packages depending on pypi/kokoro (deps.dev), captured point-in-time each snapshot.
An adoption signal, not part of the momentum score.
Verdict
Kokoro-82M is tracked. No axis is currently rising relative to its cohort, and it has no second (citation) axis available.
Path to Rising: needs development velocity to recover (at least 5 commits per week and a positive within-cohort slope); a second measurable axis to exist (no academic paper is currently tracked).
Score derived from public data on Evidaxis methodology m2, never edited by hand. Cite as:
“Evidaxis, Kokoro-82M, entity e_MB6DQ5PDDKH, snapshot 2026-w32.”