Evidaxis

GLM-V

repo
Multimodal Foundation Models · n = 13 · zai-org/GLM-V
1 of 3 axes measurable · conf low
convergence gate
Convergence gate: Gate: not computable — 1 of 3 axes measurable Development velocity: measured × Citation momentum: not measurable ∅ Direct-dependents momentum (deps.dev): not measurable ∅
gate
0 of 3 axes

Gate: not computable — 1 of 3 axes measurable

Gate: not computable — 1 of 3 axes measurable
position in cohort distribution one of 13 in cohort
percentile 0 within cohort p25 p50 p75 p0 p100
percentile
p0
momentum averages present-axis z-scores; two- and three-axis scores are not strictly comparable
velocity z
velocity z gaugevelocity z-3.00 within cohort, log-slope -0.018/wk.0-3.00
velocity z
-3.00 σ
slope
-0.018/wk
log-slope -0.018/wk
citation z Citation source: not measured.
direct-dependents z Direct-dependents axis: outside the frozen panel; not measured.
cohort
13
systems measured
weekly commits
0.2
Development velocity axis: measured.
total citations
n/a
Citation source: not measured.
momentum
12.5
percentile p0
commit heatmap, last 26 weeks0.2/wk
weekly commits, 26 weeks26 weeks of commits, peak 6 in a week, 6 active weeks, 11 total.week 1: 6 commitsweek 2: 1 commitsweek 3: 0 commitsweek 4: 0 commitsweek 5: 0 commitsweek 6: 0 commitsweek 7: 1 commitsweek 8: 0 commitsweek 9: 0 commitsweek 10: 0 commitsweek 11: 0 commitsweek 12: 0 commitsweek 13: 0 commitsweek 14: 0 commitsweek 15: 0 commitsweek 16: 1 commitsweek 17: 1 commitsweek 18: 0 commitsweek 19: 0 commitsweek 20: 0 commitsweek 21: 0 commitsweek 22: 0 commitsweek 23: 1 commitsweek 24: 0 commitsweek 25: 0 commitsweek 26: 0 commits
weeks
26
peak/wk
6
active
6
total
11
citations by yearCitation source: not measured.

GLM-V holds an Evidaxis momentum score of 12.5 of 100 on methodology m3, snapshot 2026-09-26, measured within the Multimodal Foundation Models cohort (n = 13). Axis coverage: 1 of 3 axes measurable. Gate: not computable — 1 of 3 axes measurable

Derived signals

second-order reads, computed from the published series

Three signals ship when the commit series is statistically sufficient; the rest are held in a reserved state until the data supports them. A reserved signal shows its reason, never a fabricated number. How these are computed.

recency-weighted swing trailing 13-week vs prior 39-week log-slope ratio +24.18, regime accelerating. prior slope -0.001, recent slope -0.015 per week. -0.001prior 39w-0.015recent 13w+24.18×
swing
+24.18×
regime
accelerating
windows
13w vs 39w
snapshot 1 of 1 · · m3
commit Sharpereserved: <26 non-zero commit weeks
commit changepoint52 weekly commit points. No significant changepoint detected (|delta slope| within the noise floor).no significant changepoint
changepoint
none detected
snapshot 1 of 1 · · m3
code-leads-citation lag reserved

reserved: citation series too short / axis absent for cross-correlation

status
reserved
value
insufficient data
snapshot 1 of 1 · · m3
axis alpha vs cohort reserved

reserved: cohort N too small for regression (power ~0)

status
reserved
value
insufficient data
snapshot 1 of 1 · · m3
gate ETA reserved

reserved: needs snapshot history (1 snapshot exists)

status
reserved
value
insufficient history
snapshot 1 of 1 · · m3
methodology gate snapshot 1 of 1 · · m3
commit weeks
52
citation years
0
shipped
2
reserved
4

shipped

  • recency-swing
  • commit-changepoint

reserved

  • commit-sharpe
  • code-leads-citation-lag
  • axis-alpha
  • gate-eta
snapshot 1 of 1 · · m3

Measurement states

GLM-V is under weekly measurement. History: 12 weekly observations; minimum 4. Development velocity axis: measured. Citation source: not measured. Direct-dependents axis: outside the frozen panel; not measured. Gate: not computable — 1 of 3 axes measurable

Sources

zai-org/GLM-V development-velocity axis

Direct-dependents momentum (deps.dev)

Direct-dependents axis: outside the frozen panel; not measured.

Coverage state
out_of_panel
Cohort z
no axis
OLS slope
n/a
Theil-Sen slope
n/a
Latest direct dependents
n/a
Confirmed-clean points
n/a
Reconstructed history points
n/a
As-of partition
n/a
Fragility veto
n/a
Rising vote
no

Source: deps.dev (Google), CC-BY 4.0. Modified: aggregated to system-level counts and momentum scores.

Axis definition · Snapshot axis correlations

entity_id e_C6EM2RQNX2S methodology m3 snapshot 9d2fe956adbc period 2026-w39 record JSON ↓ source snapshot

Score derived from public data on Evidaxis methodology m3, never edited by hand. Cite as: “Evidaxis, GLM-V, entity e_C6EM2RQNX2S, snapshot 2026-w39.”

Durable reference (format-independent): urn:evidaxis:claim:e_C6EM2RQNX2S:m3:2026-09-26