Evidaxis
Dated record

opencv

repo · opencv/opencv · paper: not linked · as of

Niche: not yet assigned.

42.2 commits per week averaged over the trailing window. No paper is linked in OpenAlex. Dependents: no admitted own package. 91,205 GitHub stars, recorded, not scored. Measured for opencv as of 2026-10-17; sources: GitHub, OpenAlex and deps.dev where linked. Source definitions and captured readings accompany these measurements.

commits/wk 42.2 averaged, trailing window last commit week 2026-10-11 measured · GitHub ·
citations no paper linked all years, indexed to date no reading · OpenAlex ·
direct dependents not in the scored panel weekly axis input; partition 2026-10-17 no reading · deps.dev snapshot ·
stars 91,205 recorded, not scored measured · GitHub ·

Is opencv still maintained?

42.2 commits per week averaged over the trailing window.

GitHub averaged 42.2 per week over the trailing window; raw weekly counts below are individual weeks.

Last commit week 2026-10-11.

Commits in the latest captured week vs 4 weeks earlier: 29 · vs 26 weeks earlier: 44 · 52-week range: 4 to 76 commits in an individual week.

line chart: opencv, weekly commits, 72 in latest week, 2025-10-19 to 2026-10-11
opencv averaged 42.2 commits a week. GitHub commit_activity · .
Latest eight weeks
Week startingCommits
2026-08-2323
2026-08-3015
2026-09-0639
2026-09-1343
2026-09-2059
2026-09-2766
2026-10-0472
2026-10-1172
heatmap chart: opencv, weeks with commits, 26 of 26, 2026-04-19 to 2026-10-11
26 of the last 26 captured weeks had commits for opencv. GitHub commit_activity · .
All 52 weeks
Weekly commits
Week startingCommits
2025-10-1921
2025-10-2613
2025-11-0215
2025-11-0927
2025-11-1632
2025-11-2327
2025-11-3036
2025-12-0733
2025-12-1452
2025-12-2150
2025-12-2818
2026-01-0413
2026-01-114
2026-01-1819
2026-01-2516
2026-02-018
2026-02-0821
2026-02-1511
2026-02-2216
2026-03-0119
2026-03-0820
2026-03-1516
2026-03-2216
2026-03-2929
2026-04-0510
2026-04-1228
2026-04-1933
2026-04-2627
2026-05-0332
2026-05-1029
2026-05-1755
2026-05-2468
2026-05-3165
2026-06-0736
2026-06-1451
2026-06-2155
2026-06-2849
2026-07-0576
2026-07-1243
2026-07-1932
2026-07-2650
2026-08-0221
2026-08-0915
2026-08-1631
2026-08-2323
2026-08-3015
2026-09-0639
2026-09-1343
2026-09-2059
2026-09-2766
2026-10-0472
2026-10-1172

GitHub commit_activity · period 2025-10-19 to 2026-10-11 · n = 52 weeks · method weekly totals; reconstructed dates · updated · version 4d9867e6f218-b1 · CSV

Readings

Recorded values and sources
ReadingValueΔ 4 weeksΔ 26 weeks52-week rangeInstrumentDateReproducePrevious reading
Commits per week42.25.824.714.9 to 50.8GitHub, trailing 12 weeks2026-10-17Public query37
Citing worksno readingno readingno readingno readingOpenAlex, all years2026-10-17Public queryno reading
Weekly direct dependentsno readingno readingno readingno readingWeekly direct dependents2026-10-17Public queryno reading
Daily package dependents (unscored)no readingno readingno readingno readingdeps.dev REST, unscorednot capturedPublic queryno reading
Stars91,205315no reading90,439 to 91,205GitHub stars, unscored2026-10-17Public query91,156

Evidaxis snapshot · period 2026-10-17 · n = 1 system · method source linked readings · updated · version 4d9867e6f218-b1

How to cite opencv's record?

Evidaxis. opencv measurement record. Snapshot 2026-10-17. urn:evidaxis:claim:e_824XAJ5ETWG:m5:2026-10-17. CC0-1.0. https://evidaxis.org/e/e_824XAJ5ETWG/

Evidaxis · period 2026-10-17 · n = 1 system · method claim URN · updated · version 4d9867e6f218-b1

What changed since the last snapshot?

2 published readings changed between snapshots ad5e404d4f82 and 4d9867e6f218.

slope chart: opencv, changed published values, 2, 2026-10-10 to 2026-10-17
2 published values changed for opencv since 2026-10-10. Evidaxis snapshots · .
Snapshot values
MetricPreviousCurrentDelta
Commits per week3742.25.2
Citing worksno readingno readingno reading
Weekly direct dependentsno readingno readingno reading
Stars91,15691,20549

Evidaxis snapshots · period 2026-10-10 to 2026-10-17 · n = 10 partitions · method paired snapshot values · updated · version 4d9867e6f218-b1 · History CSV

Take the data or follow changes

Values and captured history are available under CC0-1.0. The system feed records changes to published numbers.

Evidaxis · period 2026-10-17 · n = 1 system · method CC0-1.0 open export · updated · version 4d9867e6f218-b1

For teams tracking many systems

Use the cohort CSV, snapshot archive and membership manifest to reproduce observations across systems.

Cohort CSV · Snapshot archive · Membership manifest

Paper and links

Source records identify the system, repository and linked works; no paper authors are published.

What is not measured for opencv, and why

Missing readings describe instrument coverage. A missing value is not a measured zero.

Unmeasured slots
ReadingReason
Citing worksnot linked
Weekly direct dependentsoutside panel
Daily package dependents (unscored)no reading captured

Dependents: no admitted own package.

Gate ETA: never published; Evidaxis makes no public actionable prediction.

Dependents ecosystem composition: no reading; this field is not present in the snapshot.

Evidaxis · period 2026-10-17 · n = 1 system · method measurement coverage · updated · version 4d9867e6f218-b1

Measurement detail

Gate, gauges, percentile, derived signals and snapshot receipt

History: 10 weekly observations; minimum 4. Axis coverage: 1 of 3 axes measurable. Gate: not computable - 1 of 3 axes measurable

Gate: not computable - 1 of 3 axes measurable

opencv

repo
Unassigned (AI-v1 census) · n = 6153 · opencv/opencv
1 of 3 axes measurable · conf low
convergence gate
Convergence gate: Gate: not computable - 1 of 3 axes measurable Development velocity: measured × Citation momentum: not measurable ∅ Direct-dependents momentum (deps.dev): not measurable ∅
gate
0 of 3 axes

Gate: not computable - 1 of 3 axes measurable

· Evidaxis snapshot · 2026-10-17
Gate: not computable - 1 of 3 axes measurable
position in cohort distribution one of 6153 in cohort
percentile 67 within cohort p25 p50 p75 p0 p100
percentile
p67
· Evidaxis snapshot · 2026-10-17
momentum averages present-axis z-scores; two- and three-axis scores are not strictly comparable
velocity z
velocity z gaugevelocity z+0.13 within cohort, log-slope +0.005/wk.0+0.13
velocity z
+0.13 σ
slope
+0.005/wk
· Evidaxis snapshot · 2026-10-17
log-slope +0.005/wk
citation z Citation source: not measured.
direct-dependents z Direct-dependents axis: no admitted own package; not measured.
cohort
6153
systems measured
weekly commits
42.2
Development velocity axis: measured.
total citations
no reading
Citation source: not measured.
momentum
51.7
percentile p67
commit heatmap, last 26 weeks42.2/wk
weekly commits, 26 weeks26 weeks of commits, peak 76 in a week, 26 active weeks, 1157 total.week 1: 33 commitsweek 2: 27 commitsweek 3: 32 commitsweek 4: 29 commitsweek 5: 55 commitsweek 6: 68 commitsweek 7: 65 commitsweek 8: 36 commitsweek 9: 51 commitsweek 10: 55 commitsweek 11: 49 commitsweek 12: 76 commitsweek 13: 43 commitsweek 14: 32 commitsweek 15: 50 commitsweek 16: 21 commitsweek 17: 15 commitsweek 18: 31 commitsweek 19: 23 commitsweek 20: 15 commitsweek 21: 39 commitsweek 22: 43 commitsweek 23: 59 commitsweek 24: 66 commitsweek 25: 72 commitsweek 26: 72 commits
weeks
26
peak/wk
76
active
26
total
1157
· Evidaxis snapshot · 2026-10-17
citations by yearCitation source: not measured.
recency-weighted swing trailing 13-week vs prior 39-week log-slope ratio +3.49, regime accelerating. prior slope +0.025, recent slope +0.089 per week. +0.025prior 39w+0.089recent 13w+3.49×
swing
+3.49×
regime
accelerating
windows
13w vs 39w
snapshot 1 of 1 · · m5
commit-axis Sharpe log-linear slope over residual std, value +0.036 with 95% CI +0.003 to +0.069, 50 degrees of freedom. CI excludes zero.0+0.03695% CI +0.003, +0.069+0.003+0.069
sharpe
+0.036
95% ci
+0.003, +0.069
dof
50
snapshot 1 of 1 · · m5
commit changepoint52 weekly commit points. Changepoint at week 46 (2026-09-05), slope change +8.773 commits per week.2026-09-05
date
week
46 of 52
Δslope
+8.773/wk
snapshot 1 of 1 · · m5
code-leads-citation lag reserved

reserved: citation series too short / axis absent for cross-correlation

status
reserved
value
insufficient data
snapshot 1 of 1 · · m5
axis alpha vs cohort reserved

reserved: cohort N too small for regression (power ~0)

status
reserved
value
insufficient data
snapshot 1 of 1 · · m5
methodology gate snapshot 1 of 1 · · m5
commit weeks
52
citation years
0
shipped
3
reserved
3

shipped

  • recency-swing
  • commit-sharpe
  • commit-changepoint

reserved

  • code-leads-citation-lag
  • axis-alpha
  • gate-eta
snapshot 10 of 10 · · m5

Direct-dependents momentum (deps.dev)

Direct-dependents axis: no admitted own package; not measured.

Coverage state
out_of_panel
Cohort z
no axis
OLS slope
no reading
Theil-Sen slope
no reading
Latest direct dependents
no reading
Confirmed-clean points
no reading
Reconstructed history points
no reading
As-of partition
no reading
Fragility veto
no reading
Rising vote
no

Source: deps.dev (Google), CC-BY 4.0. Modified: aggregated to system-level counts and momentum scores.

Axis definition · Snapshot axis correlations

Evidaxis · period 2026-10-17 · n = 1 system · method measurement detail · updated · version 4d9867e6f218-b1 · record JSON · snapshot receipt