Evidaxis
Dated record

jvector

repo · datastax/jvector · paper: not linked · as of

Niche: not yet assigned.

2.7 commits per week averaged over the trailing window. No paper is linked in OpenAlex. Dependents: no reading captured in the partition. 1,757 GitHub stars, recorded, not scored. Measured for jvector as of 2026-11-07; sources: GitHub, OpenAlex and deps.dev where linked.

commits/wk 2.7 averaged, trailing window last commit week 2026-11-01 measured · GitHub ·
citations no paper linked all years, indexed to date no reading · OpenAlex ·
direct dependents not captured this week weekly axis input; partition 2026-11-07 no reading · deps.dev snapshot ·
stars 1,757 recorded, not scored measured · GitHub ·

Is jvector still maintained?

2.7 commits per week averaged over the trailing window.

GitHub averaged 2.7 per week over the trailing window; raw weekly counts below are individual weeks.

Last commit week 2026-11-01.

Commits in the latest captured week vs 4 weeks earlier: 2 · vs 26 weeks earlier: 3 · 52-week range: 0 to 10 commits in an individual week.

line chart: jvector, weekly commits, 3 in latest week, 2025-11-09 to 2026-11-01
jvector averaged 2.7 commits a week. GitHub commit_activity · .
Latest eight weeks
Week startingCommits
2026-09-136
2026-09-201
2026-09-270
2026-10-041
2026-10-1110
2026-10-185
2026-10-250
2026-11-013
heatmap chart: jvector, weeks with commits, 18 of 26, 2026-05-10 to 2026-11-01
18 of the last 26 captured weeks had commits for jvector. GitHub commit_activity · .
All 52 weeks
Weekly commits
Week startingCommits
2025-11-093
2025-11-1610
2025-11-232
2025-11-300
2025-12-071
2025-12-140
2025-12-210
2025-12-280
2026-01-040
2026-01-110
2026-01-183
2026-01-259
2026-02-012
2026-02-087
2026-02-153
2026-02-222
2026-03-010
2026-03-082
2026-03-150
2026-03-222
2026-03-291
2026-04-052
2026-04-121
2026-04-191
2026-04-261
2026-05-030
2026-05-100
2026-05-170
2026-05-241
2026-05-310
2026-06-077
2026-06-144
2026-06-210
2026-06-281
2026-07-054
2026-07-123
2026-07-191
2026-07-261
2026-08-021
2026-08-092
2026-08-163
2026-08-230
2026-08-303
2026-09-060
2026-09-136
2026-09-201
2026-09-270
2026-10-041
2026-10-1110
2026-10-185
2026-10-250
2026-11-013

GitHub commit_activity · period 2025-11-09 to 2026-11-01 · n = 52 weeks · method weekly totals; reconstructed dates · updated · version 868e3c39d9c7-b1 · CSV

Readings

Recorded values and sources
ReadingValueΔ 4 weeksΔ 26 weeks52-week rangeInstrumentDateReproducePrevious reading
Commits per week2.71.11.50.8 to 2.8GitHub, trailing 12 weeks2026-11-07Public query2.6
Citing worksno readingno readingno readingno readingOpenAlex, all years2026-11-07Public queryno reading
Weekly direct dependentsno readingno readingno readingno readingWeekly direct dependents2026-11-07Public queryno reading
Daily package dependents (unscored)no readingno readingno readingno readingdeps.dev REST, unscorednot capturedPublic queryno reading
Stars1,7574no reading1,750 to 1,757GitHub stars, unscored2026-11-07Public query1,757

Evidaxis snapshot · period 2026-11-07 · n = 1 system · method source linked readings · updated · version 868e3c39d9c7-b1

How to cite jvector's record?

Evidaxis. jvector measurement record. Snapshot 2026-11-07. urn:evidaxis:claim:e_804H6841E86:m5:2026-11-07. CC0-1.0. https://evidaxis.org/e/e_804H6841E86/

Evidaxis · period 2026-11-07 · n = 1 system · method claim URN · updated · version 868e3c39d9c7-b1

What changed since the last snapshot?

1 published readings changed between snapshots d1eb0cec0f6a and 868e3c39d9c7.

slope chart: jvector, changed published values, 1, 2026-10-31 to 2026-11-07
1 published values changed for jvector since 2026-10-31. Evidaxis snapshots · .
Snapshot values
MetricPreviousCurrentDelta
Commits per week2.62.70.1
Citing worksno readingno readingno reading
Weekly direct dependentsno readingno readingno reading
Stars1,7571,7570

Evidaxis snapshots · period 2026-10-31 to 2026-11-07 · n = 7 partitions · method paired snapshot values · updated · version 868e3c39d9c7-b1 · History CSV

Take the data or follow changes

Values and captured history are available under CC0-1.0. The system feed records changes to published numbers.

Evidaxis · period 2026-11-07 · n = 1 system · method CC0-1.0 open export · updated · version 868e3c39d9c7-b1

For teams tracking many systems

Use the cohort CSV, snapshot archive and membership manifest to reproduce observations across systems.

Cohort CSV · Snapshot archive · Membership manifest

Paper and links

Source records identify the system, repository and linked works; no paper authors are published.

What is not measured for jvector, and why

Missing readings describe instrument coverage. A missing value is not a measured zero.

Unmeasured slots
ReadingReason
Citing worksnot linked
Weekly direct dependentsno partition
Daily package dependents (unscored)no reading captured

Dependents: no reading captured in the partition.

Gate ETA: never published; Evidaxis makes no public actionable prediction.

Dependents ecosystem composition: no reading; this field is not present in the snapshot.

Evidaxis · period 2026-11-07 · n = 1 system · method measurement coverage · updated · version 868e3c39d9c7-b1

Measurement detail

Gate, gauges, percentile, derived signals and snapshot receipt

History: 7 weekly observations; minimum 4. Axis coverage: 1 of 3 axes measurable. Gate: not computable - 1 of 3 axes measurable

Gate: not computable - 1 of 3 axes measurable

jvector

repo
Unassigned (AI-v1 census) · n = 6545 · datastax/jvector
1 of 3 axes measurable · conf low
convergence gate
Convergence gate: Gate: not computable - 1 of 3 axes measurable Development velocity: measured × Citation momentum: not measurable ∅ Direct-dependents momentum (deps.dev): not measurable ∅
gate
0 of 3 axes

Gate: not computable - 1 of 3 axes measurable

· Evidaxis snapshot · 2026-11-07
Gate: not computable - 1 of 3 axes measurable
position in cohort distribution one of 6545 in cohort
percentile 78 within cohort p25 p50 p75 p0 p100
percentile
p78
· Evidaxis snapshot · 2026-11-07
momentum averages present-axis z-scores; two- and three-axis scores are not strictly comparable
velocity z
velocity z gaugevelocity z+1.40 within cohort, log-slope +0.022/wk.0+1.40
velocity z
+1.40 σ
slope
+0.022/wk
· Evidaxis snapshot · 2026-11-07
log-slope +0.022/wk
citation z Citation source: not measured.
direct-dependents z Direct-dependents axis: minimum of 14 usable points of the new quantity and 5 latest dependents not met.
cohort
6545
systems measured
weekly commits
2.7
Development velocity axis: measured.
total citations
no reading
Citation source: not measured.
momentum
67.5
percentile p78
commit heatmap, last 26 weeks2.7/wk
weekly commits, 26 weeks26 weeks of commits, peak 10 in a week, 18 active weeks, 57 total.week 1: 0 commitsweek 2: 0 commitsweek 3: 1 commitsweek 4: 0 commitsweek 5: 7 commitsweek 6: 4 commitsweek 7: 0 commitsweek 8: 1 commitsweek 9: 4 commitsweek 10: 3 commitsweek 11: 1 commitsweek 12: 1 commitsweek 13: 1 commitsweek 14: 2 commitsweek 15: 3 commitsweek 16: 0 commitsweek 17: 3 commitsweek 18: 0 commitsweek 19: 6 commitsweek 20: 1 commitsweek 21: 0 commitsweek 22: 1 commitsweek 23: 10 commitsweek 24: 5 commitsweek 25: 0 commitsweek 26: 3 commits
weeks
26
peak/wk
10
active
18
total
57
· Evidaxis snapshot · 2026-11-07
citations by yearCitation source: not measured.
recency-weighted swing trailing 13-week vs prior 39-week log-slope ratio -11.96, regime recent slope sign differs from prior window. prior slope -0.002, recent slope +0.024 per week. -0.002prior 39w+0.024recent 13w-11.96×
swing
-11.96×
regime
recent slope sign differs from prior window
windows
13w vs 39w
snapshot 1 of 1 · · m5
commit-axis Sharpe log-linear slope over residual std, value +0.005 with 95% CI -0.016 to +0.026, 50 degrees of freedom. CI spans zero.0+0.00595% CI -0.016, +0.026-0.016+0.026
sharpe
+0.005
95% ci
-0.016, +0.026
dof
50
snapshot 1 of 1 · · m5
commit changepoint52 weekly commit points. No significant changepoint detected (|delta slope| within the noise floor).no significant changepoint
changepoint
none detected
snapshot 1 of 1 · · m5
code-leads-citation lag reserved

reserved: citation series too short / axis absent for cross-correlation

status
reserved
value
insufficient data
snapshot 1 of 1 · · m5
axis alpha vs cohort reserved

reserved: cohort N too small for regression (power ~0)

status
reserved
value
insufficient data
snapshot 1 of 1 · · m5
methodology gate snapshot 1 of 1 · · m5
commit weeks
52
citation years
0
shipped
3
reserved
3

shipped

  • recency-swing
  • commit-sharpe
  • commit-changepoint

reserved

  • code-leads-citation-lag
  • axis-alpha
  • gate-eta
snapshot 7 of 7 · · m5

Direct-dependents momentum (deps.dev)

Direct-dependents axis: minimum of 14 usable points of the new quantity and 5 latest dependents not met.

Coverage state
below_floor
Cohort z
no axis
OLS slope
no reading
Theil-Sen slope
no reading
Latest direct dependents
no reading
Confirmed-clean points
0
Reconstructed history points
no reading
As-of partition
no reading
Fragility veto
no reading
Rising vote
no

Source: deps.dev (Google), CC-BY 4.0. Modified: aggregated to system-level counts and momentum scores.

Axis definition · Snapshot axis correlations

Evidaxis · period 2026-11-07 · n = 1 system · method measurement detail · updated · version 868e3c39d9c7-b1 · record JSON · snapshot receipt