Evidaxis
Dated record

vision_pilot

repo · autowarefoundation/vision_pilot · paper: not linked · as of

Niche: not yet assigned.

4.5 commits per week averaged over the trailing window. No paper is linked in OpenAlex. Dependents: no admitted own package. 927 GitHub stars, recorded, not scored. Measured for vision_pilot as of 2026-11-14; sources: GitHub, OpenAlex and deps.dev where linked. Source definitions and captured readings accompany these measurements.

commits/wk 4.5 averaged, trailing window last commit week 2026-11-08 measured · GitHub ·
citations no paper linked all years, indexed to date no reading · OpenAlex ·
direct dependents not in the scored panel weekly axis input; partition 2026-11-14 no reading · deps.dev snapshot ·
stars 927 recorded, not scored measured · GitHub ·

Is vision_pilot still maintained?

4.5 commits per week averaged over the trailing window.

GitHub averaged 4.5 per week over the trailing window; raw weekly counts below are individual weeks.

Last commit week 2026-11-08.

Commits in the latest captured week vs 4 weeks earlier: 7 · vs 26 weeks earlier: -41 · 52-week range: 0 to 187 commits in an individual week.

line chart: vision_pilot, weekly commits, 9 in latest week, 2025-11-16 to 2026-11-08
vision_pilot averaged 4.5 commits a week. GitHub commit_activity · .
Latest eight weeks
Week startingCommits
2026-09-201
2026-09-270
2026-10-044
2026-10-112
2026-10-180
2026-10-253
2026-11-016
2026-11-089
heatmap chart: vision_pilot, weeks with commits, 22 of 26, 2026-05-17 to 2026-11-08
22 of the last 26 captured weeks had commits for vision_pilot. GitHub commit_activity · .
All 52 weeks
Weekly commits
Week startingCommits
2025-11-1638
2025-11-23187
2025-11-30138
2025-12-07107
2025-12-1478
2025-12-2118
2025-12-281
2026-01-040
2026-01-119
2026-01-181
2026-01-250
2026-02-0123
2026-02-0858
2026-02-1537
2026-02-2248
2026-03-0147
2026-03-0812
2026-03-1525
2026-03-2224
2026-03-2932
2026-04-0524
2026-04-1210
2026-04-1912
2026-04-268
2026-05-0364
2026-05-1050
2026-05-1781
2026-05-2416
2026-05-3135
2026-06-0714
2026-06-1412
2026-06-2154
2026-06-2822
2026-07-0533
2026-07-129
2026-07-1914
2026-07-2621
2026-08-024
2026-08-0911
2026-08-160
2026-08-2326
2026-08-301
2026-09-060
2026-09-132
2026-09-201
2026-09-270
2026-10-044
2026-10-112
2026-10-180
2026-10-253
2026-11-016
2026-11-089

GitHub commit_activity · period 2025-11-16 to 2026-11-08 · n = 52 weeks · method weekly totals; reconstructed dates · updated · version 04724603bccf-b1 · CSV

Readings

Recorded values and sources
ReadingValueΔ 4 weeksΔ 26 weeks52-week rangeInstrumentDateReproducePrevious reading
Commits per week4.5-1.5-25.23.8 to 51.7GitHub, trailing 12 weeks2026-11-14Public query3.8
Citing worksno readingno readingno readingno readingOpenAlex, all years2026-11-14Public queryno reading
Weekly direct dependentsno readingno readingno readingno readingWeekly direct dependents2026-11-14Public queryno reading
Daily package dependents (unscored)no readingno readingno readingno readingdeps.dev REST, unscorednot capturedPublic queryno reading
Stars92714no reading902 to 927GitHub stars, unscored2026-11-14Public query926

Evidaxis snapshot · period 2026-11-14 · n = 1 system · method source linked readings · updated · version 04724603bccf-b1

How to cite vision_pilot's record?

Evidaxis. vision_pilot measurement record. Snapshot 2026-11-14. urn:evidaxis:claim:e_4DK8NDEAACW:m5:2026-11-14. CC0-1.0. https://evidaxis.org/e/e_4DK8NDEAACW/

Evidaxis · period 2026-11-14 · n = 1 system · method claim URN · updated · version 04724603bccf-b1

What changed since the last snapshot?

2 published readings changed between snapshots 868e3c39d9c7 and 04724603bccf.

slope chart: vision_pilot, changed published values, 2, 2026-11-07 to 2026-11-14
2 published values changed for vision_pilot since 2026-11-07. Evidaxis snapshots · .
Snapshot values
MetricPreviousCurrentDelta
Commits per week3.84.50.7
Citing worksno readingno readingno reading
Weekly direct dependentsno readingno readingno reading
Stars9269271

Evidaxis snapshots · period 2026-11-07 to 2026-11-14 · n = 8 partitions · method paired snapshot values · updated · version 04724603bccf-b1 · History CSV

Take the data or follow changes

Values and captured history are available under CC0-1.0. The system feed records changes to published numbers.

Evidaxis · period 2026-11-14 · n = 1 system · method CC0-1.0 open export · updated · version 04724603bccf-b1

For teams tracking many systems

Use the cohort CSV, snapshot archive and membership manifest to reproduce observations across systems.

Cohort CSV · Snapshot archive · Membership manifest

Paper and links

Source records identify the system, repository and linked works; no paper authors are published.

What is not measured for vision_pilot, and why

Missing readings describe instrument coverage. A missing value is not a measured zero.

Unmeasured slots
ReadingReason
Citing worksnot linked
Weekly direct dependentsoutside panel
Daily package dependents (unscored)no reading captured

Dependents: no admitted own package.

Gate ETA: never published; Evidaxis makes no public actionable prediction.

Dependents ecosystem composition: no reading; this field is not present in the snapshot.

Evidaxis · period 2026-11-14 · n = 1 system · method measurement coverage · updated · version 04724603bccf-b1

Measurement detail

Gate, gauges, percentile, derived signals and snapshot receipt

History: 8 weekly observations; minimum 4. Axis coverage: 1 of 3 axes measurable. Gate: not computable - 1 of 3 axes measurable

Gate: not computable - 1 of 3 axes measurable

vision_pilot

repo
Unassigned (AI-v1 census) · n = 6536 · autowarefoundation/vision_pilot
1 of 3 axes measurable · conf low
convergence gate
Convergence gate: Gate: not computable - 1 of 3 axes measurable Development velocity: measured × Citation momentum: not measurable ∅ Direct-dependents momentum (deps.dev): not measurable ∅
gate
0 of 3 axes

Gate: not computable - 1 of 3 axes measurable

· Evidaxis snapshot · 2026-11-14
Gate: not computable - 1 of 3 axes measurable
position in cohort distribution one of 6536 in cohort
percentile 6 within cohort p25 p50 p75 p0 p100
percentile
p6
· Evidaxis snapshot · 2026-11-14
momentum averages present-axis z-scores; two- and three-axis scores are not strictly comparable
velocity z
velocity z gaugevelocity z-2.92 within cohort, log-slope -0.117/wk.0-2.92
velocity z
-2.92 σ
slope
-0.117/wk
· Evidaxis snapshot · 2026-11-14
log-slope -0.117/wk
citation z Citation source: not measured.
direct-dependents z Direct-dependents axis: no admitted own package; not measured.
cohort
6536
systems measured
weekly commits
4.5
Development velocity axis: measured.
total citations
no reading
Citation source: not measured.
momentum
13.5
percentile p6
commit heatmap, last 26 weeks4.5/wk
weekly commits, 26 weeks26 weeks of commits, peak 81 in a week, 22 active weeks, 380 total.week 1: 81 commitsweek 2: 16 commitsweek 3: 35 commitsweek 4: 14 commitsweek 5: 12 commitsweek 6: 54 commitsweek 7: 22 commitsweek 8: 33 commitsweek 9: 9 commitsweek 10: 14 commitsweek 11: 21 commitsweek 12: 4 commitsweek 13: 11 commitsweek 14: 0 commitsweek 15: 26 commitsweek 16: 1 commitsweek 17: 0 commitsweek 18: 2 commitsweek 19: 1 commitsweek 20: 0 commitsweek 21: 4 commitsweek 22: 2 commitsweek 23: 0 commitsweek 24: 3 commitsweek 25: 6 commitsweek 26: 9 commits
weeks
26
peak/wk
81
active
22
total
380
· Evidaxis snapshot · 2026-11-14
citations by yearCitation source: not measured.
recency-weighted swing trailing 13-week vs prior 39-week log-slope ratio -6.63, regime recent slope sign differs from prior window. prior slope -0.009, recent slope +0.059 per week. -0.009prior 39w+0.059recent 13w-6.63×
swing
-6.63×
regime
recent slope sign differs from prior window
windows
13w vs 39w
snapshot 1 of 1 · · m5
commit-axis Sharpe log-linear slope over residual std, value -0.035 with 95% CI -0.066 to -0.003, 50 degrees of freedom. CI spans zero.0-0.03595% CI -0.066, -0.003-0.066-0.003
sharpe
-0.035
95% ci
-0.066, -0.003
dof
50
snapshot 1 of 1 · · m5
commit changepoint52 weekly commit points. No significant changepoint detected (|delta slope| within the noise floor).no significant changepoint
changepoint
none detected
snapshot 1 of 1 · · m5
code-leads-citation lag reserved

reserved: citation series too short / axis absent for cross-correlation

status
reserved
value
insufficient data
snapshot 1 of 1 · · m5
axis alpha vs cohort reserved

reserved: cohort N too small for regression (power ~0)

status
reserved
value
insufficient data
snapshot 1 of 1 · · m5
methodology gate snapshot 1 of 1 · · m5
commit weeks
52
citation years
0
shipped
3
reserved
3

shipped

  • recency-swing
  • commit-sharpe
  • commit-changepoint

reserved

  • code-leads-citation-lag
  • axis-alpha
  • gate-eta
snapshot 8 of 8 · · m5

Direct-dependents momentum (deps.dev)

Direct-dependents axis: no admitted own package; not measured.

Coverage state
out_of_panel
Cohort z
no axis
OLS slope
no reading
Theil-Sen slope
no reading
Latest direct dependents
no reading
Confirmed-clean points
no reading
Reconstructed history points
no reading
As-of partition
no reading
Fragility veto
no reading
Rising vote
no

Source: deps.dev (Google), CC-BY 4.0. Modified: aggregated to system-level counts and momentum scores.

Axis definition · Snapshot axis correlations

Evidaxis · period 2026-11-14 · n = 1 system · method measurement detail · updated · version 04724603bccf-b1 · record JSON · snapshot receipt