Evidaxis

catwalk

repo
Unassigned (AI-v1 census) · n = 6545 · charmbracelet/catwalk
1 of 3 axes measurable · conf low
convergence gate
Convergence gate: Gate: not computable — 1 of 3 axes measurable Development velocity: measured × Citation momentum: not measurable ∅ Direct-dependents momentum (deps.dev): not measurable ∅
gate
0 of 3 axes

Gate: not computable — 1 of 3 axes measurable

Gate: not computable — 1 of 3 axes measurable
position in cohort distribution one of 6545 in cohort
percentile 24 within cohort p25 p50 p75 p0 p100
percentile
p24
momentum averages present-axis z-scores; two- and three-axis scores are not strictly comparable
velocity z
velocity z gaugevelocity z-0.44 within cohort, log-slope -0.008/wk.0-0.44
velocity z
-0.44 σ
slope
-0.008/wk
log-slope -0.008/wk
citation z Citation source: not measured.
direct-dependents z Direct-dependents axis: minimum of 14 usable points of the new quantity and 5 latest dependents not met.
cohort
6545
systems measured
weekly commits
17.3
Development velocity axis: measured.
total citations
n/a
Citation source: not measured.
momentum
44.5
percentile p24
commit heatmap, last 26 weeks17.3/wk
weekly commits, 26 weeks26 weeks of commits, peak 32 in a week, 26 active weeks, 477 total.week 1: 15 commitsweek 2: 24 commitsweek 3: 19 commitsweek 4: 21 commitsweek 5: 22 commitsweek 6: 19 commitsweek 7: 11 commitsweek 8: 29 commitsweek 9: 32 commitsweek 10: 14 commitsweek 11: 14 commitsweek 12: 22 commitsweek 13: 10 commitsweek 14: 17 commitsweek 15: 20 commitsweek 16: 16 commitsweek 17: 25 commitsweek 18: 13 commitsweek 19: 16 commitsweek 20: 19 commitsweek 21: 18 commitsweek 22: 10 commitsweek 23: 16 commitsweek 24: 19 commitsweek 25: 20 commitsweek 26: 16 commits
weeks
26
peak/wk
32
active
26
total
477
citations by yearCitation source: not measured.

catwalk holds an Evidaxis momentum score of 44.5 of 100 on methodology m5, snapshot 2026-11-07, measured within the Unassigned (AI-v1 census) cohort (n = 6545). Axis coverage: 1 of 3 axes measurable. Gate: not computable — 1 of 3 axes measurable

Derived signals

second-order reads, computed from the published series

Three signals ship when the commit series is statistically sufficient; the rest are held in a reserved state until the data supports them. A reserved signal shows its reason, never a fabricated number. How these are computed.

recency-weighted swing trailing 13-week vs prior 39-week log-slope ratio -0.29, regime recent slope sign differs from prior window. prior slope +0.025, recent slope -0.007 per week. +0.025prior 39w-0.007recent 13w-0.29×
swing
-0.29×
regime
recent slope sign differs from prior window
windows
13w vs 39w
snapshot 1 of 1 · · m5
commit-axis Sharpe log-linear slope over residual std, value +0.033 with 95% CI +0.011 to +0.055, 50 degrees of freedom. CI excludes zero.0+0.03395% CI +0.011, +0.055+0.011+0.055
sharpe
+0.033
95% ci
+0.011, +0.055
dof
50
snapshot 1 of 1 · · m5
commit changepoint52 weekly commit points. No significant changepoint detected (|delta slope| within the noise floor).no significant changepoint
changepoint
none detected
snapshot 1 of 1 · · m5
code-leads-citation lag reserved

reserved: citation series too short / axis absent for cross-correlation

status
reserved
value
insufficient data
snapshot 1 of 1 · · m5
axis alpha vs cohort reserved

reserved: cohort N too small for regression (power ~0)

status
reserved
value
insufficient data
snapshot 1 of 1 · · m5
gate ETA reserved

reserved: needs snapshot history (1 snapshot exists)

status
reserved
value
insufficient history
snapshot 1 of 1 · · m5
methodology gate snapshot 1 of 1 · · m5
commit weeks
52
citation years
0
shipped
3
reserved
3

shipped

  • recency-swing
  • commit-sharpe
  • commit-changepoint

reserved

  • code-leads-citation-lag
  • axis-alpha
  • gate-eta
snapshot 1 of 1 · · m5

Measurement states

catwalk is under weekly measurement. History: 7 weekly observations; minimum 4. Development velocity axis: measured. Citation source: not measured. Direct-dependents axis: minimum of 14 usable points of the new quantity and 5 latest dependents not met. Gate: not computable — 1 of 3 axes measurable

Sources

charmbracelet/catwalk development-velocity axis

Direct-dependents momentum (deps.dev)

Direct-dependents axis: minimum of 14 usable points of the new quantity and 5 latest dependents not met.

Coverage state
below_floor
Cohort z
no axis
OLS slope
n/a
Theil-Sen slope
n/a
Latest direct dependents
n/a
Confirmed-clean points
0
Reconstructed history points
n/a
As-of partition
n/a
Fragility veto
n/a
Rising vote
no

Source: deps.dev (Google), CC-BY 4.0. Modified: aggregated to system-level counts and momentum scores.

Axis definition · Snapshot axis correlations

entity_id e_ZXAPN03162X methodology m5 snapshot 868e3c39d9c7 period 2026-w45 record JSON ↓ source snapshot

Score derived from public data on Evidaxis methodology m5, never edited by hand. Cite as: “Evidaxis, catwalk, entity e_ZXAPN03162X, snapshot 2026-w45.”

Durable reference (format-independent): urn:evidaxis:claim:e_ZXAPN03162X:m5:2026-11-07