Evidaxis

tons-of-skills-marketplace

repo
Unassigned (AI-v1 census) · n = 6545 · tons-of-skills-marketplace
1 of 3 axes measurable · conf low
convergence gate
Convergence gate: Gate: not computable — 1 of 3 axes measurable Development velocity: rising vote Citation momentum: not measurable ∅ Direct-dependents momentum (deps.dev): not measurable ∅
gate
1 of 3 axes

Gate: not computable — 1 of 3 axes measurable

Gate: not computable — 1 of 3 axes measurable
position in cohort distribution one of 6545 in cohort
percentile 82 within cohort p25 p50 p75 p0 p100
percentile
p82
momentum averages present-axis z-scores; two- and three-axis scores are not strictly comparable
velocity z
velocity z gaugevelocity z+2.06 within cohort, log-slope +0.032/wk.0+2.06
velocity z
+2.06 σ
slope
+0.032/wk
log-slope +0.032/wk
citation z Citation source: not measured.
direct-dependents z Direct-dependents axis: no admitted own package; not measured.
cohort
6545
systems measured
weekly commits
102.6
Development velocity axis: measured.
total citations
n/a
Citation source: not measured.
momentum
75.7
percentile p82
commit heatmap, last 26 weeks102.6/wk
weekly commits, 26 weeks26 weeks of commits, peak 467 in a week, 26 active weeks, 1724 total.week 1: 25 commitsweek 2: 40 commitsweek 3: 31 commitsweek 4: 8 commitsweek 5: 29 commitsweek 6: 16 commitsweek 7: 16 commitsweek 8: 48 commitsweek 9: 58 commitsweek 10: 74 commitsweek 11: 22 commitsweek 12: 24 commitsweek 13: 21 commitsweek 14: 81 commitsweek 15: 199 commitsweek 16: 467 commitsweek 17: 72 commitsweek 18: 104 commitsweek 19: 33 commitsweek 20: 40 commitsweek 21: 54 commitsweek 22: 45 commitsweek 23: 13 commitsweek 24: 124 commitsweek 25: 66 commitsweek 26: 14 commits
weeks
26
peak/wk
467
active
26
total
1724
citations by yearCitation source: not measured.

tons-of-skills-marketplace holds an Evidaxis momentum score of 75.7 of 100 on methodology m5, snapshot 2026-11-07, measured within the Unassigned (AI-v1 census) cohort (n = 6545). Axis coverage: 1 of 3 axes measurable. Gate: not computable — 1 of 3 axes measurable

Derived signals

second-order reads, computed from the published series

Three signals ship when the commit series is statistically sufficient; the rest are held in a reserved state until the data supports them. A reserved signal shows its reason, never a fabricated number. How these are computed.

recency-weighted swing trailing 13-week vs prior 39-week log-slope ratio -10.26, regime recent slope sign differs from prior window. prior slope +0.014, recent slope -0.149 per week. +0.014prior 39w-0.149recent 13w-10.26×
swing
-10.26×
regime
recent slope sign differs from prior window
windows
13w vs 39w
snapshot 1 of 1 · · m5
commit-axis Sharpe log-linear slope over residual std, value +0.025 with 95% CI +0.002 to +0.048, 50 degrees of freedom. CI excludes zero.0+0.02595% CI +0.002, +0.048+0.002+0.048
sharpe
+0.025
95% ci
+0.002, +0.048
dof
50
snapshot 1 of 1 · · m5
commit changepoint52 weekly commit points. Changepoint at week 50 (2026-10-24), slope change -56.253 commits per week.2026-10-24
date
week
50 of 52
Δslope
-56.253/wk
snapshot 1 of 1 · · m5
code-leads-citation lag reserved

reserved: citation series too short / axis absent for cross-correlation

status
reserved
value
insufficient data
snapshot 1 of 1 · · m5
axis alpha vs cohort reserved

reserved: cohort N too small for regression (power ~0)

status
reserved
value
insufficient data
snapshot 1 of 1 · · m5
gate ETA reserved

reserved: needs snapshot history (1 snapshot exists)

status
reserved
value
insufficient history
snapshot 1 of 1 · · m5
methodology gate snapshot 1 of 1 · · m5
commit weeks
52
citation years
0
shipped
3
reserved
3

shipped

  • recency-swing
  • commit-sharpe
  • commit-changepoint

reserved

  • code-leads-citation-lag
  • axis-alpha
  • gate-eta
snapshot 1 of 1 · · m5

Measurement states

tons-of-skills-marketplace is under weekly measurement. History: 7 weekly observations; minimum 4. Development velocity axis: measured. Citation source: not measured. Direct-dependents axis: no admitted own package; not measured. Gate: not computable — 1 of 3 axes measurable

Sources

tons-of-skills-marketplace development-velocity axis

Direct-dependents momentum (deps.dev)

Direct-dependents axis: no admitted own package; not measured.

Coverage state
out_of_panel
Cohort z
no axis
OLS slope
n/a
Theil-Sen slope
n/a
Latest direct dependents
n/a
Confirmed-clean points
n/a
Reconstructed history points
n/a
As-of partition
n/a
Fragility veto
n/a
Rising vote
no

Source: deps.dev (Google), CC-BY 4.0. Modified: aggregated to system-level counts and momentum scores.

Axis definition · Snapshot axis correlations

entity_id e_THDCBD3A6CV methodology m5 snapshot 868e3c39d9c7 period 2026-w45 record JSON ↓ source snapshot

Score derived from public data on Evidaxis methodology m5, never edited by hand. Cite as: “Evidaxis, tons-of-skills-marketplace, entity e_THDCBD3A6CV, snapshot 2026-w45.”

Durable reference (format-independent): urn:evidaxis:claim:e_THDCBD3A6CV:m5:2026-11-07