Evidaxis

models

repo
Unassigned (AI-v1 census) · n = 6545 · reyamira/models
1 of 3 axes measurable · conf low
convergence gate
Convergence gate: Gate: not computable — 1 of 3 axes measurable Development velocity: measured × Citation momentum: not measurable ∅ Direct-dependents momentum (deps.dev): not measurable ∅
gate
0 of 3 axes

Gate: not computable — 1 of 3 axes measurable

Gate: not computable — 1 of 3 axes measurable
position in cohort distribution one of 6545 in cohort
percentile 15 within cohort p25 p50 p75 p0 p100
percentile
p15
momentum averages present-axis z-scores; two- and three-axis scores are not strictly comparable
velocity z
velocity z gaugevelocity z-1.47 within cohort, log-slope -0.024/wk.0-1.47
velocity z
-1.47 σ
slope
-0.024/wk
log-slope -0.024/wk
citation z Citation source: not measured.
direct-dependents z Direct-dependents axis: minimum of 14 usable points of the new quantity and 5 latest dependents not met.
cohort
6545
systems measured
weekly commits
197.9
Development velocity axis: measured.
total citations
n/a
Citation source: not measured.
momentum
31.6
percentile p15
commit heatmap, last 26 weeks197.9/wk
weekly commits, 26 weeks26 weeks of commits, peak 349 in a week, 26 active weeks, 6491 total.week 1: 155 commitsweek 2: 193 commitsweek 3: 192 commitsweek 4: 203 commitsweek 5: 297 commitsweek 6: 344 commitsweek 7: 343 commitsweek 8: 349 commitsweek 9: 340 commitsweek 10: 341 commitsweek 11: 343 commitsweek 12: 340 commitsweek 13: 331 commitsweek 14: 345 commitsweek 15: 340 commitsweek 16: 345 commitsweek 17: 329 commitsweek 18: 197 commitsweek 19: 136 commitsweek 20: 152 commitsweek 21: 152 commitsweek 22: 147 commitsweek 23: 153 commitsweek 24: 148 commitsweek 25: 147 commitsweek 26: 129 commits
weeks
26
peak/wk
349
active
26
total
6491
citations by yearCitation source: not measured.

models holds an Evidaxis momentum score of 31.6 of 100 on methodology m5, snapshot 2026-11-07, measured within the Unassigned (AI-v1 census) cohort (n = 6545). Axis coverage: 1 of 3 axes measurable. Gate: not computable — 1 of 3 axes measurable

Derived signals

second-order reads, computed from the published series

Three signals ship when the commit series is statistically sufficient; the rest are held in a reserved state until the data supports them. A reserved signal shows its reason, never a fabricated number. How these are computed.

recency-weighted swing trailing 13-week vs prior 39-week log-slope ratio -0.51, regime recent slope sign differs from prior window. prior slope +0.175, recent slope -0.089 per week. +0.175prior 39w-0.089recent 13w-0.51×
swing
-0.51×
regime
recent slope sign differs from prior window
windows
13w vs 39w
snapshot 1 of 1 · · m5
commit-axis Sharpe log-linear slope over residual std, value +0.075 with 95% CI +0.022 to +0.127, 50 degrees of freedom. CI excludes zero.0+0.07595% CI +0.022, +0.127+0.022+0.127
sharpe
+0.075
95% ci
+0.022, +0.127
dof
50
snapshot 1 of 1 · · m5
commit changepoint52 weekly commit points. Changepoint at week 40 (2026-08-15), slope change -30.467 commits per week.2026-08-15
date
week
40 of 52
Δslope
-30.467/wk
snapshot 1 of 1 · · m5
code-leads-citation lag reserved

reserved: citation series too short / axis absent for cross-correlation

status
reserved
value
insufficient data
snapshot 1 of 1 · · m5
axis alpha vs cohort reserved

reserved: cohort N too small for regression (power ~0)

status
reserved
value
insufficient data
snapshot 1 of 1 · · m5
gate ETA reserved

reserved: needs snapshot history (1 snapshot exists)

status
reserved
value
insufficient history
snapshot 1 of 1 · · m5
methodology gate snapshot 1 of 1 · · m5
commit weeks
52
citation years
0
shipped
3
reserved
3

shipped

  • recency-swing
  • commit-sharpe
  • commit-changepoint

reserved

  • code-leads-citation-lag
  • axis-alpha
  • gate-eta
snapshot 1 of 1 · · m5

Measurement states

models is under weekly measurement. History: 7 weekly observations; minimum 4. Development velocity axis: measured. Citation source: not measured. Direct-dependents axis: minimum of 14 usable points of the new quantity and 5 latest dependents not met. Gate: not computable — 1 of 3 axes measurable

Sources

reyamira/models development-velocity axis

Direct-dependents momentum (deps.dev)

Direct-dependents axis: minimum of 14 usable points of the new quantity and 5 latest dependents not met.

Coverage state
below_floor
Cohort z
no axis
OLS slope
n/a
Theil-Sen slope
n/a
Latest direct dependents
n/a
Confirmed-clean points
0
Reconstructed history points
n/a
As-of partition
n/a
Fragility veto
n/a
Rising vote
no

Source: deps.dev (Google), CC-BY 4.0. Modified: aggregated to system-level counts and momentum scores.

Axis definition · Snapshot axis correlations

entity_id e_NFMF5Y686VS methodology m5 snapshot 868e3c39d9c7 period 2026-w45 record JSON ↓ source snapshot

Score derived from public data on Evidaxis methodology m5, never edited by hand. Cite as: “Evidaxis, models, entity e_NFMF5Y686VS, snapshot 2026-w45.”

Durable reference (format-independent): urn:evidaxis:claim:e_NFMF5Y686VS:m5:2026-11-07