Evidaxis

paca

repo
Unassigned (AI-v1 census) · n = 6545 · Paca-AI/paca
1 of 3 axes measurable · conf low
convergence gate
Convergence gate: Gate: not computable — 1 of 3 axes measurable Development velocity: rising vote Citation momentum: not measurable ∅ Direct-dependents momentum (deps.dev): not measurable ∅
gate
1 of 3 axes

Gate: not computable — 1 of 3 axes measurable

Gate: not computable — 1 of 3 axes measurable
position in cohort distribution one of 6545 in cohort
percentile 76 within cohort p25 p50 p75 p0 p100
percentile
p76
momentum averages present-axis z-scores; two- and three-axis scores are not strictly comparable
velocity z
velocity z gaugevelocity z+1.14 within cohort, log-slope +0.018/wk.0+1.14
velocity z
+1.14 σ
slope
+0.018/wk
log-slope +0.018/wk
citation z Citation source: not measured.
direct-dependents z Direct-dependents axis: no admitted own package; not measured.
cohort
6545
systems measured
weekly commits
48.3
Development velocity axis: measured.
total citations
n/a
Citation source: not measured.
momentum
64.3
percentile p76
commit heatmap, last 26 weeks48.3/wk
weekly commits, 26 weeks26 weeks of commits, peak 90 in a week, 26 active weeks, 1174 total.week 1: 50 commitsweek 2: 56 commitsweek 3: 6 commitsweek 4: 34 commitsweek 5: 64 commitsweek 6: 54 commitsweek 7: 28 commitsweek 8: 23 commitsweek 9: 38 commitsweek 10: 50 commitsweek 11: 50 commitsweek 12: 33 commitsweek 13: 56 commitsweek 14: 52 commitsweek 15: 63 commitsweek 16: 38 commitsweek 17: 59 commitsweek 18: 39 commitsweek 19: 28 commitsweek 20: 34 commitsweek 21: 38 commitsweek 22: 25 commitsweek 23: 48 commitsweek 24: 47 commitsweek 25: 90 commitsweek 26: 71 commits
weeks
26
peak/wk
90
active
26
total
1174
citations by yearCitation source: not measured.

paca holds an Evidaxis momentum score of 64.3 of 100 on methodology m5, snapshot 2026-11-07, measured within the Unassigned (AI-v1 census) cohort (n = 6545). Axis coverage: 1 of 3 axes measurable. Gate: not computable — 1 of 3 axes measurable

Derived signals

second-order reads, computed from the published series

Three signals ship when the commit series is statistically sufficient; the rest are held in a reserved state until the data supports them. A reserved signal shows its reason, never a fabricated number. How these are computed.

recency-weighted swing trailing 13-week vs prior 39-week log-slope ratio +0.13, regime recent slope below prior window. prior slope +0.142, recent slope +0.018 per week. +0.142prior 39w+0.018recent 13w+0.13×
swing
+0.13×
regime
recent slope below prior window
windows
13w vs 39w
snapshot 1 of 1 · · m5
commit-axis Sharpe log-linear slope over residual std, value +0.089 with 95% CI +0.033 to +0.146, 50 degrees of freedom. CI excludes zero.0+0.08995% CI +0.033, +0.146+0.033+0.146
sharpe
+0.089
95% ci
+0.033, +0.146
dof
50
snapshot 1 of 1 · · m5
commit changepoint52 weekly commit points. Changepoint at week 48 (2026-10-10), slope change +12.131 commits per week.2026-10-10
date
week
48 of 52
Δslope
+12.131/wk
snapshot 1 of 1 · · m5
code-leads-citation lag reserved

reserved: citation series too short / axis absent for cross-correlation

status
reserved
value
insufficient data
snapshot 1 of 1 · · m5
axis alpha vs cohort reserved

reserved: cohort N too small for regression (power ~0)

status
reserved
value
insufficient data
snapshot 1 of 1 · · m5
gate ETA reserved

reserved: needs snapshot history (1 snapshot exists)

status
reserved
value
insufficient history
snapshot 1 of 1 · · m5
methodology gate snapshot 1 of 1 · · m5
commit weeks
52
citation years
0
shipped
3
reserved
3

shipped

  • recency-swing
  • commit-sharpe
  • commit-changepoint

reserved

  • code-leads-citation-lag
  • axis-alpha
  • gate-eta
snapshot 1 of 1 · · m5

Measurement states

paca is under weekly measurement. History: 7 weekly observations; minimum 4. Development velocity axis: measured. Citation source: not measured. Direct-dependents axis: no admitted own package; not measured. Gate: not computable — 1 of 3 axes measurable

Sources

Paca-AI/paca development-velocity axis

Direct-dependents momentum (deps.dev)

Direct-dependents axis: no admitted own package; not measured.

Coverage state
out_of_panel
Cohort z
no axis
OLS slope
n/a
Theil-Sen slope
n/a
Latest direct dependents
n/a
Confirmed-clean points
n/a
Reconstructed history points
n/a
As-of partition
n/a
Fragility veto
n/a
Rising vote
no

Source: deps.dev (Google), CC-BY 4.0. Modified: aggregated to system-level counts and momentum scores.

Axis definition · Snapshot axis correlations

entity_id e_KE159C4GN49 methodology m5 snapshot 868e3c39d9c7 period 2026-w45 record JSON ↓ source snapshot

Score derived from public data on Evidaxis methodology m5, never edited by hand. Cite as: “Evidaxis, paca, entity e_KE159C4GN49, snapshot 2026-w45.”

Durable reference (format-independent): urn:evidaxis:claim:e_KE159C4GN49:m5:2026-11-07