Evidaxis

cherry-studio

repo
Unassigned (AI-v1 census) · n = 6545 · CherryHQ/cherry-studio
1 of 3 axes measurable · conf low
convergence gate
Convergence gate: Gate: not computable — 1 of 3 axes measurable Development velocity: rising vote Citation momentum: not measurable ∅ Direct-dependents momentum (deps.dev): not measurable ∅
gate
1 of 3 axes

Gate: not computable — 1 of 3 axes measurable

Gate: not computable — 1 of 3 axes measurable
position in cohort distribution one of 6545 in cohort
percentile 76 within cohort p25 p50 p75 p0 p100
percentile
p76
momentum averages present-axis z-scores; two- and three-axis scores are not strictly comparable
velocity z
velocity z gaugevelocity z+1.25 within cohort, log-slope +0.023/wk.0+1.25
velocity z
+1.25 σ
slope
+0.023/wk
log-slope +0.023/wk
citation z Citation source: not measured.
direct-dependents z Direct-dependents axis: no admitted own package; not measured.
cohort
6545
systems measured
weekly commits
201
Development velocity axis: measured.
total citations
n/a
Citation source: not measured.
momentum
65.7
percentile p76
commit heatmap, last 26 weeks201/wk
weekly commits, 26 weeks26 weeks of commits, peak 441 in a week, 26 active weeks, 5312 total.week 1: 74 commitsweek 2: 52 commitsweek 3: 84 commitsweek 4: 123 commitsweek 5: 109 commitsweek 6: 179 commitsweek 7: 243 commitsweek 8: 198 commitsweek 9: 203 commitsweek 10: 268 commitsweek 11: 235 commitsweek 12: 328 commitsweek 13: 441 commitsweek 14: 363 commitsweek 15: 351 commitsweek 16: 246 commitsweek 17: 190 commitsweek 18: 163 commitsweek 19: 227 commitsweek 20: 156 commitsweek 21: 72 commitsweek 22: 98 commitsweek 23: 282 commitsweek 24: 150 commitsweek 25: 230 commitsweek 26: 247 commits
weeks
26
peak/wk
441
active
26
total
5312
citations by yearCitation source: not measured.

cherry-studio holds an Evidaxis momentum score of 65.7 of 100 on methodology m5, snapshot 2026-11-07, measured within the Unassigned (AI-v1 census) cohort (n = 6545). Axis coverage: 1 of 3 axes measurable. Gate: not computable — 1 of 3 axes measurable

Derived signals

second-order reads, computed from the published series

Three signals ship when the commit series is statistically sufficient; the rest are held in a reserved state until the data supports them. A reserved signal shows its reason, never a fabricated number. How these are computed.

recency-weighted swing trailing 13-week vs prior 39-week log-slope ratio -1.05, regime recent slope sign differs from prior window. prior slope +0.038, recent slope -0.040 per week. +0.038prior 39w-0.040recent 13w-1.05×
swing
-1.05×
regime
recent slope sign differs from prior window
windows
13w vs 39w
snapshot 1 of 1 · · m5
commit-axis Sharpe log-linear slope over residual std, value +0.053 with 95% CI +0.024 to +0.083, 50 degrees of freedom. CI excludes zero.0+0.05395% CI +0.024, +0.083+0.024+0.083
sharpe
+0.053
95% ci
+0.024, +0.083
dof
50
snapshot 1 of 1 · · m5
commit changepoint52 weekly commit points. Changepoint at week 50 (2026-10-24), slope change +44.221 commits per week.2026-10-24
date
week
50 of 52
Δslope
+44.221/wk
snapshot 1 of 1 · · m5
code-leads-citation lag reserved

reserved: citation series too short / axis absent for cross-correlation

status
reserved
value
insufficient data
snapshot 1 of 1 · · m5
axis alpha vs cohort reserved

reserved: cohort N too small for regression (power ~0)

status
reserved
value
insufficient data
snapshot 1 of 1 · · m5
gate ETA reserved

reserved: needs snapshot history (1 snapshot exists)

status
reserved
value
insufficient history
snapshot 1 of 1 · · m5
methodology gate snapshot 1 of 1 · · m5
commit weeks
52
citation years
0
shipped
3
reserved
3

shipped

  • recency-swing
  • commit-sharpe
  • commit-changepoint

reserved

  • code-leads-citation-lag
  • axis-alpha
  • gate-eta
snapshot 1 of 1 · · m5

Reconstructed history

cherry-studio reconstructed weekly commits52 points, range 9 to 235 commits/wk.
min
9 commits/wk
max
235 commits/wk
latest
13 commits/wk
points
52

Weekly commits over the past year, reconstructed from git history (GitHub commit_activity). This is reconstructed, not a point-in-time capture. Evidaxis captures the Type-2 signals (watchers, issues, dependents) live and never backfills them; those are the moat.

Measurement states

cherry-studio is under weekly measurement. History: 9 weekly observations; minimum 4. Development velocity axis: measured. Citation source: not measured. Direct-dependents axis: no admitted own package; not measured. Gate: not computable — 1 of 3 axes measurable

Sources

CherryHQ/cherry-studio development-velocity axis

Direct-dependents momentum (deps.dev)

Direct-dependents axis: no admitted own package; not measured.

Coverage state
out_of_panel
Cohort z
no axis
OLS slope
n/a
Theil-Sen slope
n/a
Latest direct dependents
n/a
Confirmed-clean points
n/a
Reconstructed history points
n/a
As-of partition
n/a
Fragility veto
n/a
Rising vote
no

Source: deps.dev (Google), CC-BY 4.0. Modified: aggregated to system-level counts and momentum scores.

Axis definition · Snapshot axis correlations

entity_id e_BRB68FCWQQ1 methodology m5 snapshot 868e3c39d9c7 period 2026-w45 record JSON ↓ source snapshot

Score derived from public data on Evidaxis methodology m5, never edited by hand. Cite as: “Evidaxis, cherry-studio, entity e_BRB68FCWQQ1, snapshot 2026-w45.”

Durable reference (format-independent): urn:evidaxis:claim:e_BRB68FCWQQ1:m5:2026-11-07