Evidaxis

superplane

repo
Unassigned (AI-v1 census) · n = 6545 · superplanehq/superplane
1 of 3 axes measurable · conf low
convergence gate
Convergence gate: Gate: not computable — 1 of 3 axes measurable Development velocity: rising vote Citation momentum: not measurable ∅ Direct-dependents momentum (deps.dev): not measurable ∅
gate
1 of 3 axes

Gate: not computable — 1 of 3 axes measurable

Gate: not computable — 1 of 3 axes measurable
position in cohort distribution one of 6545 in cohort
percentile 84 within cohort p25 p50 p75 p0 p100
percentile
p84
momentum averages present-axis z-scores; two- and three-axis scores are not strictly comparable
velocity z
velocity z gaugevelocity z+2.36 within cohort, log-slope +0.038/wk.0+2.36
velocity z
+2.36 σ
slope
+0.038/wk
log-slope +0.038/wk
citation z Citation source: not measured.
direct-dependents z Direct-dependents axis: minimum of 14 usable points of the new quantity and 5 latest dependents not met.
cohort
6545
systems measured
weekly commits
118.7
Development velocity axis: measured.
total citations
n/a
Citation source: not measured.
momentum
79.5
percentile p84
commit heatmap, last 26 weeks118.7/wk
weekly commits, 26 weeks26 weeks of commits, peak 167 in a week, 26 active weeks, 2232 total.week 1: 44 commitsweek 2: 57 commitsweek 3: 63 commitsweek 4: 36 commitsweek 5: 92 commitsweek 6: 109 commitsweek 7: 52 commitsweek 8: 72 commitsweek 9: 70 commitsweek 10: 67 commitsweek 11: 48 commitsweek 12: 24 commitsweek 13: 25 commitsweek 14: 49 commitsweek 15: 61 commitsweek 16: 88 commitsweek 17: 117 commitsweek 18: 114 commitsweek 19: 136 commitsweek 20: 167 commitsweek 21: 122 commitsweek 22: 135 commitsweek 23: 158 commitsweek 24: 134 commitsweek 25: 140 commitsweek 26: 52 commits
weeks
26
peak/wk
167
active
26
total
2232
citations by yearCitation source: not measured.

superplane holds an Evidaxis momentum score of 79.5 of 100 on methodology m5, snapshot 2026-11-07, measured within the Unassigned (AI-v1 census) cohort (n = 6545). Axis coverage: 1 of 3 axes measurable. Gate: not computable — 1 of 3 axes measurable

Derived signals

second-order reads, computed from the published series

Three signals ship when the commit series is statistically sufficient; the rest are held in a reserved state until the data supports them. A reserved signal shows its reason, never a fabricated number. How these are computed.

recency-weighted swing trailing 13-week vs prior 39-week log-slope ratio +6.47, regime accelerating. prior slope +0.006, recent slope +0.040 per week. +0.006prior 39w+0.040recent 13w+6.47×
swing
+6.47×
regime
accelerating
windows
13w vs 39w
snapshot 1 of 1 · · m5
commit-axis Sharpe log-linear slope over residual std, value +0.039 with 95% CI +0.014 to +0.064, 50 degrees of freedom. CI excludes zero.0+0.03995% CI +0.014, +0.064+0.014+0.064
sharpe
+0.039
95% ci
+0.014, +0.064
dof
50
snapshot 1 of 1 · · m5
commit changepoint52 weekly commit points. No significant changepoint detected (|delta slope| within the noise floor).no significant changepoint
changepoint
none detected
snapshot 1 of 1 · · m5
code-leads-citation lag reserved

reserved: citation series too short / axis absent for cross-correlation

status
reserved
value
insufficient data
snapshot 1 of 1 · · m5
axis alpha vs cohort reserved

reserved: cohort N too small for regression (power ~0)

status
reserved
value
insufficient data
snapshot 1 of 1 · · m5
gate ETA reserved

reserved: needs snapshot history (1 snapshot exists)

status
reserved
value
insufficient history
snapshot 1 of 1 · · m5
methodology gate snapshot 1 of 1 · · m5
commit weeks
52
citation years
0
shipped
3
reserved
3

shipped

  • recency-swing
  • commit-sharpe
  • commit-changepoint

reserved

  • code-leads-citation-lag
  • axis-alpha
  • gate-eta
snapshot 1 of 1 · · m5

Measurement states

superplane is under weekly measurement. History: 7 weekly observations; minimum 4. Development velocity axis: measured. Citation source: not measured. Direct-dependents axis: minimum of 14 usable points of the new quantity and 5 latest dependents not met. Gate: not computable — 1 of 3 axes measurable

Sources

superplanehq/superplane development-velocity axis

Direct-dependents momentum (deps.dev)

Direct-dependents axis: minimum of 14 usable points of the new quantity and 5 latest dependents not met.

Coverage state
below_floor
Cohort z
no axis
OLS slope
n/a
Theil-Sen slope
n/a
Latest direct dependents
n/a
Confirmed-clean points
0
Reconstructed history points
n/a
As-of partition
n/a
Fragility veto
n/a
Rising vote
no

Source: deps.dev (Google), CC-BY 4.0. Modified: aggregated to system-level counts and momentum scores.

Axis definition · Snapshot axis correlations

entity_id e_AKV6FWRTNS9 methodology m5 snapshot 868e3c39d9c7 period 2026-w45 record JSON ↓ source snapshot

Score derived from public data on Evidaxis methodology m5, never edited by hand. Cite as: “Evidaxis, superplane, entity e_AKV6FWRTNS9, snapshot 2026-w45.”

Durable reference (format-independent): urn:evidaxis:claim:e_AKV6FWRTNS9:m5:2026-11-07