Evidaxis

LiteRT-LM

repo
Unassigned (AI-v1 census) · n = 5778 · google-ai-edge/LiteRT-LM
1 of 3 axes measurable · conf low
convergence gate
Convergence gate: Gate: not computable — history 1 of 4 weekly observations Development velocity: rising vote Citation momentum: not measurable ∅ Direct-dependents momentum (deps.dev): not measurable ∅
gate
1 of 3 axes

Gate: not computable — history 1 of 4 weekly observations

Gate: not computable — history 1 of 4 weekly observations
position in cohort distribution one of 5778 in cohort
percentile 81 within cohort p25 p50 p75 p0 p100
percentile
p81
momentum averages present-axis z-scores; two- and three-axis scores are not strictly comparable
velocity z
velocity z gaugevelocity z+1.34 within cohort, log-slope +0.016/wk.0+1.34
velocity z
+1.34 σ
slope
+0.016/wk
log-slope +0.016/wk
citation z Citation source: not measured.
direct-dependents z Direct-dependents axis: outside the frozen panel; not measured.
cohort
5778
systems measured
weekly commits
56.3
Development velocity axis: measured.
total citations
n/a
Citation source: not measured.
momentum
66.8
percentile p81
commit heatmap, last 26 weeks56.3/wk
weekly commits, 26 weeks26 weeks of commits, peak 89 in a week, 26 active weeks, 1222 total.week 1: 52 commitsweek 2: 38 commitsweek 3: 28 commitsweek 4: 47 commitsweek 5: 58 commitsweek 6: 39 commitsweek 7: 38 commitsweek 8: 46 commitsweek 9: 39 commitsweek 10: 39 commitsweek 11: 32 commitsweek 12: 36 commitsweek 13: 37 commitsweek 14: 17 commitsweek 15: 54 commitsweek 16: 75 commitsweek 17: 56 commitsweek 18: 49 commitsweek 19: 52 commitsweek 20: 40 commitsweek 21: 43 commitsweek 22: 57 commitsweek 23: 66 commitsweek 24: 43 commitsweek 25: 89 commitsweek 26: 52 commits
weeks
26
peak/wk
89
active
26
total
1222
citations by yearCitation source: not measured.

LiteRT-LM holds an Evidaxis momentum score of 66.8 of 100 on methodology m3, snapshot 2026-09-26, measured within the Unassigned (AI-v1 census) cohort (n = 5778). Axis coverage: 1 of 3 axes measurable. Gate: not computable — history 1 of 4 weekly observations

Derived signals

second-order reads, computed from the published series

Three signals ship when the commit series is statistically sufficient; the rest are held in a reserved state until the data supports them. A reserved signal shows its reason, never a fabricated number. How these are computed.

recency-weighted swing trailing 13-week vs prior 39-week log-slope ratio +3.69, regime accelerating. prior slope +0.011, recent slope +0.040 per week. +0.011prior 39w+0.040recent 13w+3.69×
swing
+3.69×
regime
accelerating
windows
13w vs 39w
snapshot 1 of 1 · · m3
commit-axis Sharpe log-linear slope over residual std, value +0.030 with 95% CI +0.001 to +0.059, 50 degrees of freedom. CI excludes zero.0+0.03095% CI +0.001, +0.059+0.001+0.059
sharpe
+0.030
95% ci
+0.001, +0.059
dof
50
snapshot 1 of 1 · · m3
commit changepoint52 weekly commit points. Changepoint at week 4 (2025-10-25), slope change -8.365 commits per week.2025-10-25
date
week
4 of 52
Δslope
-8.365/wk
snapshot 1 of 1 · · m3
code-leads-citation lag reserved

reserved: citation series too short / axis absent for cross-correlation

status
reserved
value
insufficient data
snapshot 1 of 1 · · m3
axis alpha vs cohort reserved

reserved: cohort N too small for regression (power ~0)

status
reserved
value
insufficient data
snapshot 1 of 1 · · m3
gate ETA reserved

reserved: needs snapshot history (1 snapshot exists)

status
reserved
value
insufficient history
snapshot 1 of 1 · · m3
methodology gate snapshot 1 of 1 · · m3
commit weeks
52
citation years
0
shipped
3
reserved
3

shipped

  • recency-swing
  • commit-sharpe
  • commit-changepoint

reserved

  • code-leads-citation-lag
  • axis-alpha
  • gate-eta
snapshot 1 of 1 · · m3

Measurement states

LiteRT-LM is under weekly measurement. History: 1 of 4 weekly observations. Development velocity axis: measured. Citation source: not measured. Direct-dependents axis: outside the frozen panel; not measured. Gate: not computable — history 1 of 4 weekly observations

Sources

google-ai-edge/LiteRT-LM development-velocity axis

Direct-dependents momentum (deps.dev)

Direct-dependents axis: outside the frozen panel; not measured.

Coverage state
out_of_panel
Cohort z
no axis
OLS slope
n/a
Theil-Sen slope
n/a
Latest direct dependents
n/a
Confirmed-clean points
n/a
Reconstructed history points
n/a
As-of partition
n/a
Fragility veto
n/a
Rising vote
no

Source: deps.dev (Google), CC-BY 4.0. Modified: aggregated to system-level counts and momentum scores.

Axis definition · Snapshot axis correlations

entity_id e_7T1681EZGXB methodology m3 snapshot 9d2fe956adbc period 2026-w39 record JSON ↓ source snapshot

Score derived from public data on Evidaxis methodology m3, never edited by hand. Cite as: “Evidaxis, LiteRT-LM, entity e_7T1681EZGXB, snapshot 2026-w39.”

Durable reference (format-independent): urn:evidaxis:claim:e_7T1681EZGXB:m3:2026-09-26