Evidaxis

PyRIT

repo
Unassigned (AI-v1 census) · n = 6545 · microsoft/PyRIT
1 of 3 axes measurable · conf low
convergence gate
Convergence gate: Gate: not computable — 1 of 3 axes measurable Development velocity: rising vote Citation momentum: not measurable ∅ Direct-dependents momentum (deps.dev): not measurable ∅
gate
1 of 3 axes

Gate: not computable — 1 of 3 axes measurable

Gate: not computable — 1 of 3 axes measurable
position in cohort distribution one of 6545 in cohort
percentile 89 within cohort p25 p50 p75 p0 p100
percentile
p89
momentum averages present-axis z-scores; two- and three-axis scores are not strictly comparable
velocity z
velocity z gaugevelocity z+2.90 within cohort, log-slope +0.046/wk.0+2.90
velocity z
+2.90 σ
slope
+0.046/wk
log-slope +0.046/wk
citation z Citation source: not measured.
direct-dependents z Direct-dependents axis: minimum of 14 usable points of the new quantity and 5 latest dependents not met.
cohort
6545
systems measured
weekly commits
79.2
Development velocity axis: measured.
total citations
n/a
Citation source: not measured.
momentum
86.3
percentile p89
commit heatmap, last 26 weeks79.2/wk
weekly commits, 26 weeks26 weeks of commits, peak 147 in a week, 26 active weeks, 1507 total.week 1: 31 commitsweek 2: 33 commitsweek 3: 54 commitsweek 4: 86 commitsweek 5: 35 commitsweek 6: 39 commitsweek 7: 14 commitsweek 8: 45 commitsweek 9: 37 commitsweek 10: 47 commitsweek 11: 37 commitsweek 12: 24 commitsweek 13: 34 commitsweek 14: 41 commitsweek 15: 45 commitsweek 16: 43 commitsweek 17: 37 commitsweek 18: 45 commitsweek 19: 49 commitsweek 20: 92 commitsweek 21: 56 commitsweek 22: 85 commitsweek 23: 147 commitsweek 24: 123 commitsweek 25: 101 commitsweek 26: 127 commits
weeks
26
peak/wk
147
active
26
total
1507
citations by yearCitation source: not measured.

PyRIT holds an Evidaxis momentum score of 86.3 of 100 on methodology m5, snapshot 2026-11-07, measured within the Unassigned (AI-v1 census) cohort (n = 6545). Axis coverage: 1 of 3 axes measurable. Gate: not computable — 1 of 3 axes measurable

Derived signals

second-order reads, computed from the published series

Three signals ship when the commit series is statistically sufficient; the rest are held in a reserved state until the data supports them. A reserved signal shows its reason, never a fabricated number. How these are computed.

recency-weighted swing trailing 13-week vs prior 39-week log-slope ratio +2.55, regime accelerating. prior slope +0.044, recent slope +0.111 per week. +0.044prior 39w+0.111recent 13w+2.55×
swing
+2.55×
regime
accelerating
windows
13w vs 39w
snapshot 1 of 1 · · m5
commit-axis Sharpe log-linear slope over residual std, value +0.103 with 95% CI +0.079 to +0.127, 50 degrees of freedom. CI excludes zero.0+0.10395% CI +0.079, +0.127+0.079+0.127
sharpe
+0.103
95% ci
+0.079, +0.127
dof
50
snapshot 1 of 1 · · m5
commit changepoint52 weekly commit points. No significant changepoint detected (|delta slope| within the noise floor).no significant changepoint
changepoint
none detected
snapshot 1 of 1 · · m5
code-leads-citation lag reserved

reserved: citation series too short / axis absent for cross-correlation

status
reserved
value
insufficient data
snapshot 1 of 1 · · m5
axis alpha vs cohort reserved

reserved: cohort N too small for regression (power ~0)

status
reserved
value
insufficient data
snapshot 1 of 1 · · m5
gate ETA reserved

reserved: needs snapshot history (1 snapshot exists)

status
reserved
value
insufficient history
snapshot 1 of 1 · · m5
methodology gate snapshot 1 of 1 · · m5
commit weeks
52
citation years
0
shipped
3
reserved
3

shipped

  • recency-swing
  • commit-sharpe
  • commit-changepoint

reserved

  • code-leads-citation-lag
  • axis-alpha
  • gate-eta
snapshot 1 of 1 · · m5

Measurement states

PyRIT is under weekly measurement. History: 7 weekly observations; minimum 4. Development velocity axis: measured. Citation source: not measured. Direct-dependents axis: minimum of 14 usable points of the new quantity and 5 latest dependents not met. Gate: not computable — 1 of 3 axes measurable

Sources

microsoft/PyRIT development-velocity axis

Direct-dependents momentum (deps.dev)

Direct-dependents axis: minimum of 14 usable points of the new quantity and 5 latest dependents not met.

Coverage state
below_floor
Cohort z
no axis
OLS slope
n/a
Theil-Sen slope
n/a
Latest direct dependents
3
Confirmed-clean points
1
Reconstructed history points
n/a
As-of partition
n/a
Fragility veto
n/a
Rising vote
no

Source: deps.dev (Google), CC-BY 4.0. Modified: aggregated to system-level counts and momentum scores.

Axis definition · Snapshot axis correlations

entity_id e_4D9137NJFA5 methodology m5 snapshot 868e3c39d9c7 period 2026-w45 record JSON ↓ source snapshot

Score derived from public data on Evidaxis methodology m5, never edited by hand. Cite as: “Evidaxis, PyRIT, entity e_4D9137NJFA5, snapshot 2026-w45.”

Durable reference (format-independent): urn:evidaxis:claim:e_4D9137NJFA5:m5:2026-11-07